An experienced professional, I have a proven track record in Strategic Management support, Development Management, and Programme & Project Controls with c.15 years of experience in the delivery of large multi-disciplinary schemes within the Rail industry. I am an effective communicator, able to lead, manage and be part of diverse and inclusive teams and have demonstrated the ability to communicate with impact to senior stakeholders and subject matter experts alike. I’m resilient and have shown the determination and initiative required to work in challenging and changing environments. I’m capable of creating and implementing controls processes from scratch, and actively seek to work in continuously improving environments.
On a personal level, I’d consider myself to be an approachable, positive and supportive person who embraces integrity, learning, growth, physical and mental health & wellbeing, and someone who strives to help and improve myself, my family and my colleagues. I also love live music and travel.
Oct 2023 – June 2024 PDA Project Controls Ltd – Director - Contracted into Network Rail via MACE as Programme Development Manager (Hybrid)
Development Programme Manager supporting Network Rail with -
Strategic guidance to Capital Delivery STEP NW&C route under their new management structure and operating arrangements. Creating opportunities for efficiency and communicating progress to route directors.
Designing and Developing processes and procedures to populate the programme management plan to deliver strategic objectives.
Implementing Route led ICOM operating model.
Supporting Director and SLT with bespoke requests and requirements.
Sep 2022 – July 2023 PDA Project Controls Ltd – Director - Contracted into Network Rail via MACE as CP7 Strategic Management lead for CD STEP NW&C portfolio (Hybrid)
Strategic lead for prioritising and planning the implementation of Control Period 7 (CP7), Networks Rail's 5 year funding envelope for Capital Delivery NW&C Route Signalling, Telecoms and E&P Team.
Developing and delivery a strategy to deliver CP7
Stakeholder Management, bringing together multi-disciplinary teams to understand perspectives and objectives toward delivering a common goal
Understanding and Communicating the Strategic Business Plan commitments, volumes and unit rates and working with Route and Regional owners to build a strategy to deliver CP7.
Supporting Director and SLT with bespoke requests and requirements
Oct 2016 – July 2022 High Speed 2 Ltd (HS2) – Senior Project Controls Manager – Route-wide Systems & On Network works (Hybrid)
The Rail Systems portfolio is a suite of c.£4bn of projects designed to deliver the infrastructure required to run HS2 trains once the Civils construction work is ready for handover.
The Rail Systems portfolio is a suite of c.£4bn of projects designed to deliver the infrastructure required to run HS2 trains once the Civils construction work is ready for handover.
(Oct 21 – Jul 22) Project Controls Workstream Lead for the Rail Systems readiness project – Responsible for interpreting the proposed Alliance agreement and putting the plan in place to adapt the business-as-usual data systems / platforms, processes and procedures to compliment the upcoming introduction of 10 Alliance contractors.
(Jan – Jul 22) Tender Assessment & Moderation – I successfully co-authored the Works Information requirements for project controls and then assessed & moderated c.10 tender responses in SEA Procure Award software as part of the procurement process.
(Apr – Aug 21) Estimate Refresh (Rail Systems affordability exercise) – from concept to final delivery - I proposed and developed a waterfall style cost baseline, including works categorisation and coding structures, trends, high probability risks / opportunities, potential scope modifications, and assumptions / exclusions. I was responsible for the co-creation and presentation to the Chief Financial Office (CFO) and co-ordinated the final sign-off and Change Control process.
(Apr - Jun 20) portfolio wide Quantative Risk Assessment (QRA) exercise - As senior Project Controls Manager I was instrumental in the creation, compilation and delivery of the Risk Assessment, involving the re-classification and qualification of c.£1bn of risk exposure, this involved identifying the scope, requirements and time constraints of the exercise, compiling a delivery plan, organising and delivering Subject Matter Experts (SME) sessions collated information, and co-running risk identification sessions with the risk team. I then compiled a presentation pack and co-delivered the outputs to the Executive Committee and CFO for endorsement.
The On-Network Works portfolio is a suit of c.£1bn multi-disciplinary intervention projects designed to ensure Network Rail’s infrastructure works with High Speed 2.
(2016 -2018) Joint Implementation Programme - I was instrumental in the initial set-up and management of the tripartite arrangement for Project Controls between Network Rail (NR) (Sponsor), Network Rail (Deliverer) IP, and High Speed 2 Ltd (Client) reporting to the Department for Transport (DfT). I acted as the lead responsible Controls manager for a portfolio. I designed joint sessions to be a continuous improvement forum drawing information gathered from Joint team MBR’s.
Baseline 7 – I set up and managed a 12-month process to successfully deliver ONW’s Baseline 7 submission as part of HS2’s submission towards notice to proceed (NTP), this included full details of Scope, Cost, Schedule, Risk, Change and associated Assumptions and Exclusions. I lead the programme to complete Baseline 7 across On Network Works, designing and managing the population of reports to enable detailed information to be gathered from joint teams. I lead the process of Line of Defence (LoD) 1 & 2 response working closely with assessors to achieve a successful LoD score and submission towards Baseline 7 (BL7). This work resulted in an aligned view with Network Rail regarding the submission of BL7 Cost and Programme, a first for High Speed 2.
I ensured On-Network Works (ONW) provides Controls information with accuracy and integrity to constructively influence the ONW programme, and effectively engaged with multiple stakeholders such as Project Directors, Head of Controls, Network Rail directors, the Department for Transport, P-Rep Auditors, PwC Auditors etc. This includes setting up and managing cost reporting process considering such complexities as the 4 weekly / monthly variance of reporting cycles. I co-designed and incorporated controls programme management protocols such as Joint baseline agreement forms, joint milestones definition forms, SharePoint sites.
Sept 2014 – Oct 2016 Network Rail – Programme Controls Manager – IP Signalling Northern, LNW Region (Manchester)
Responsible for Programme Controls across the Infrastructure Projects (IP) Signalling Manchester region to a cumulative Anticipated Final Cost (AFC) in excess £400million. I managed the Programme Controls and Planning Function including Principal and Project planners, Planning assistants and Document Controllers. Responsible cross-discipline programme engagement across team Subject Matter Experts (SMEs)
Business Planning and CP5 and CP6 (control Period) 5 yearly budgeting periods. I was responsible for creating Primavera P6 cost-loaded schedules and work closely with the Commercial Management teams and Route Managers to accurately profile Control Period spend forecasting.
Jan 2009 – Aug 2014 Network Rail – Principal Project Planner – IP Signalling, LNW Region
(Birmingham / Manchester)
Responsible for Planning Projects across the Signalling and Telecom LNW region to a cumulative Anticipated Final Cost (AFC) in excess £300million. Manage plans so they are fully resource loaded and profiled correctly, interrogate contractor plans. Report actual performance and variance against plan and develop recovery programs when objectives change.
Education & Qualifications
2003 – 2005 BA (Hons) in Business Management (2:1)
Staffordshire University - (Shrewsbury College of Arts and Technology)
2001 – 2003 BTEC HNC in Business Management
Shrewsbury College of Arts and Technology
1993 – 1996 BTEC HNC in Mechanical / Manufacturing Engineering
Staffordshire University
Professional Training / Memberships
Memberships
APM – MAPM Full Membership to Association for Project Management (member since 2009)
APMP - Association for project management qualification
previously I’ve been a Prince2 Practitioner - project management accredited
HS2 Classroom Learning
NEC ECC Project Manager Accreditation
NEC3 ECC Programming workshop
NEC3 ECC Compensation Events workshop
Several Diversity, Wellbeing and mental health workshops
Network Rail Classroom Learning
Senior Leaders Programme
Electrification Engineering Principles
Pertmaster Practitioner
Inclusive Leadership
Signalling Engineering Principles
Project Management, Planning and Control
PPS Possession Planning System
Estimating for Non-Estimators
Project Safety Management
Risk Management for Projects
OP02 – Oracle Projects for Commercial Assistants (Network Rail)
Other Professional Learning
Previously held -
CSCS Manager
IOSH Managing Safely Diploma
Also CDM Awareness Training
City & Guilds 2D Computer Aided Drafting Levels 2 & 3
Several LEEA ’Lifting Equipment Engineers Association’ qualifications, ISO 9001:2000 Auditor
Systems Proficiency
AWARD – Tender review software
ARES PRISM – Enterprise Project Controls System
Oracle Projects, Applications E Business Suite
Microsoft Power BI
P6 – Primavera Project Management Software
Microsoft Office and MS Project
Xactium & ARM Risk Management
Pertmaster – Primavera Risk Analysis
CEMAR
Bentley eB
PPS – Possession Planning
Acumen FUSE schedule assessment tool
DWWP – Delivering Work within Possessions
Developing and administering Relational Databases. Using query and report writing software